MIKE 11



C:\Dropbox\!Share_NilsUmerMarc\0\MIKE11\karup.sim11



Volume Balance Summary


A: Initial volume in model area         0.00 m^3
B: Final volume in model area         0.00 m^3
MIKE SHE overland inflow 17673.55 m^3        
MIKE SHE baseflow inflow 60506031.20 m^3        
MIKE SHE drain inflow 22509032.87 m^3        
Lateral sources inflow 0.00 m^3        
Lateral correction 214.13 m^3        
Open boundaries inflow 6054.71 m^3        
Rainfall runoff inflow 0.00 m^3        
C: Total inflow         83039006.46 m^3
MIKE SHE overland outflow     0.00 m^3    
MIKE SHE baseflow outflow     214.13 m^3    
MIKE SHE Drain outflow     0.00 m^3    
Lateral sinks outflow     0.00 m^3    
Open boundaries outflow     0.00 m^3    
Rainfall runoff outflow     0.00 m^3    
D: Total outflow         214.13 m^3
E: Continuity balance = B-A-C+D =         -83038792.33 m^3
Relative deficit E/max(A,B,C,D) =         -1.00 ()