MIKE 11



C:\work\SOLProjects\11810549_HydroCast\TestModels\Karup\ObsModel\MIKE11\karup.sim11



Volume Balance Summary


A: Initial volume in model area         0.00 m^3
B: Final volume in model area         0.00 m^3
MIKE SHE overland inflow 114547.72 m^3        
MIKE SHE baseflow inflow 329015067.12 m^3        
MIKE SHE drain inflow 122883518.63 m^3        
Lateral sources inflow 0.00 m^3        
Lateral correction 1201.99 m^3        
Open boundaries inflow 4981.17 m^3        
Rainfall runoff inflow 0.00 m^3        
C: Total inflow         452019316.63 m^3
MIKE SHE overland outflow     0.00 m^3    
MIKE SHE baseflow outflow     1201.99 m^3    
MIKE SHE Drain outflow     0.00 m^3    
Lateral sinks outflow     0.00 m^3    
Open boundaries outflow     0.00 m^3    
Rainfall runoff outflow     0.00 m^3    
D: Total outflow         1201.99 m^3
E: Continuity balance = B-A-C+D =         -452018114.64 m^3
Relative deficit E/max(A,B,C,D) =         -1.00 ()