A: Initial volume in model area | 0.00 | m^3 | ||||
---|---|---|---|---|---|---|
B: Final volume in model area | 0.00 | m^3 | ||||
MIKE SHE overland inflow | 102303.47 | m^3 | ||||
MIKE SHE baseflow inflow | 355079171.04 | m^3 | ||||
MIKE SHE drain inflow | 137978773.73 | m^3 | ||||
Lateral sources inflow | 0.00 | m^3 | ||||
Lateral correction | 1192.72 | m^3 | ||||
Open boundaries inflow | 5568.69 | m^3 | ||||
Rainfall runoff inflow | 0.00 | m^3 | ||||
C: Total inflow | 493167009.64 | m^3 | ||||
MIKE SHE overland outflow | 0.00 | m^3 | ||||
MIKE SHE baseflow outflow | 1192.77 | m^3 | ||||
MIKE SHE Drain outflow | 0.00 | m^3 | ||||
Lateral sinks outflow | 0.00 | m^3 | ||||
Open boundaries outflow | 0.00 | m^3 | ||||
Rainfall runoff outflow | 0.00 | m^3 | ||||
D: Total outflow | 1192.77 | m^3 | ||||
E: Continuity balance = B-A-C+D = | -493165816.87 | m^3 | ||||
Relative deficit E/max(A,B,C,D) = | -1.00 | () | ||||